Sector

Civil Construction

Calypso supports civil construction projects involving jack-ups. Civil projects may be performed in-shore, near shore or offshore. We support pile driving operations, lifting operations for construction and for deconstruction, soil investigation or survey projects, lifts to and from barges, extended lifts to shore, and more. We support construction of jetties, quays, bridges, causeways, locks, and more.

Civil Construction

At Calypso, we understand that jack-ups and jack-up operations in civil projects can take many shapes. There are lift boats, modular jack-ups, purpose-built construction jack-ups, mono-hulls and offshore jack-ups being used for civil projects. Also, the project locations are highly variable, ranging from offshore, to near-shore, to estuaries, to in-shore and upriver.

Because of the diversity in jack-up usage, it is all the more important to correctly apply rules to ensure safe operations. Most codes and standards apply to offshore operations and are not readily applicable throughout. Calypso seeks to apply those standards and parts of them that are most applicable to any specific operation. These include:

  • ISO 19905-1:2023
  • IJUBOA Guidance Note
  • DNV RP-C104 (2022)
  • Class requirements
  • IMO Intact Stability (2008)

Services

Services include any assessment required for a jack-up to perform planned operations at any specific site. Our reports stand out through readability and clarity. Each report is directly suitable for use on-board and on-shore as well as for third party review and verification. A dedicated Captain’s summary provides a single page, tabulated and illustrated overview of any report.

A Site-Specific Assessment (SSA) determines the suitability of a jack-up to perform planned operations and to survive the extreme environment. The structural strength, overturning stability and foundation capacity are ensured to be sufficient. Deck layout, load eccentricities and effects of crane operations are included.

A Leg Penetration Analysis (LPA) is included in the SSA, but may be performed stand-alone if an SSA is not required. This could be the case when planned operations and survival are within design limits. The LPA presents the range of expected penetrations and provides hands-on preload guidance. It addresses any geotechnical risks with respect to installation of the unit.

Floating stability may have to be addressed for the specific deck layout. Sometimes it is required to determine the ballast plan for even keel and to comply with draft and stability requirements. A Stability Analysis report presents the ballast plan and loading condition. It indicates compliance with criteria such as IMO intact Stability.

Crawler crane operations

Many civil project include crawler crane operations. The crawler crane is positioned on deck, typically rolled on board from quayside. The crawler crane may be fixed at or near the center of the unit, but may also move around the deck. Calypso assists clients in specifying the required crane for the project, determining the limitations of the crane operations and determining the optimum location of the crane on deck. The determined crane operations and their effects are included in the SSA.

Tender support 

A technically well-founded tender proposal helps securing projects and ensures that expectations are managed and aligned.

We support contractors in writing tender proposals and we deliver technical content, including uptime percentage estimates and weather limitations for planned operations. More and more tender proposals are supported by analysis reports.

We support equipment owners ensuring that their jack-ups are used within tolerances and specifications. Our assessments readily translate to hands-on requirements regarding operations and survival.

Testimonials

What our customers say about us

''Calypso is responsive and straight-forward to work with, understand our operations and have the ability to provide short turn-arounds. All of which we need to operate our assets in a flexible and efficient manner.''
Mads Albér
Chief Technology and Innovation Officer
''Very positive collaboration, short response time and replies on time, we are happy to have Calypso as our consultant for installation jack up assessment and settlements analysis of existing units.''
Elysée Mahend
Coastal Development Engineer, Perenco
''Calypso delivers fast responses and support. Their hands-on engineers stay closely involved to ensure results.''
Geert Weymeis
Offshore Wind Engineering, Jan de Nul
''Calypso doesn’t just deliver services. They deliver trust, reliability, and strategic impact. That is why we consider them a vital partner in driving Jack Up Barge continued growth and leadership.''
Damiaan Sprenger
Commercial Director, Jack-Up Barge
“Very supportive, short response time, deep knowledge on jack-up operations – we are happy to have Calypso as our consultant for jack-up operations.”
Johannes Katz
Project Engineer, Blue Installation Group