When speed matters – Assessment-on-demand for O&M of offshore wind turbines

Last week, along-standing client reached out to us, for a challengingly urgent engineering scope for a jack-up. An offshore wind turbine had deteriorated overnight and required immediate intervention for Major Component Replacement (MCR). They had a jack-up already working in the wind farm, with the necessary component on deck, but no engineering package in place for this particular location. Also,the weather window for transit and positioning was closing.

For operations and maintenance of offshore wind turbines, Calypso offers Assessment-on-demand.With our detailed jack-up models and extensive database of geotechnical and metocean data, we can quickly deliver full site assessments, without compromising compliance or safety.

In this case, within just a few hours, the complete move documentation was produced and approved. Before preloading at the new location was finished, we had already updated the documentation to include the lifts required for the MCR. The operation proceeded without a single minute of downtime waiting on engineering.

When O&M jack-up operations demand immediate, high‑confidence decision-making, Calypso ensures the engineering is ready before the assets are.

Calypso, when speed matters.

Insights

Relevant for you

Other articles

7 tips for a successful offshore operation

Read more
Other articles

Workability of offshore operations – the gap between on-board and desktop interpretations

Read more
Other articles

Monitoring of offshore operations – A tongue-in-cheek introduction about what can go wrong and what to do about it

Read more

Ready to elevate your jack-up operation?

Let’s get in touch.
Discover Calypso